PROJECT INFO & THESIS OVERVIEW
This project is aimed to completely re-purpose the historical former Flint Journal Building. The main aim of the re-purpose of this building is to maintain and/or restore the historical element within the building and creates a contemporary facility that accommodates public health research, clinical labs, classrooms and event spaces. I would be investigating other mechanical options that could be incorporated into making building more efficient.
CAPSTONE INFORMATION
The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. It's purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here
EVENTS AND NEWS FEEDS
-
12. 07. 2016 PROGRESS CHECK
-
04 21. 2017 FINAL CHECKLIST COMPLETED
-
04 21. 2017 ABET REFLECTION CHART COMPLETED
-
04 09. 2017 FINAL PRESENTATION
-
04 03. 2017 FINAL PREPORT COMPLETED
-
02. 10. 2017 PROJECT MILESTONE COMPLETED
-
01. 17. 2017 FINAL PROPOSAL POSTED
-
12. 07. 2016 PROGRESS CHECK
-
12. 05. 2016 FINAL CPEP REVIEW
-
11.. 28. 2016 TECH REPORT I, II, II POSTED
-
10. 24. 2016 ABSTRACT POSTED
-
10. 19. 2016 BUILDING STATISTICS II POSTED
-
10. 03. 2016 BUILDING STATISTICS I DRAFT
-
09.26. 2016 ABSTRACT
-
09. 16. 2016 BIO SKETCH POSTED
-
09. 12. 2016 CPEP FULL FUNCTIONAL
-
09. 06. 2016 CPEP HOME PAGE DRAFT
-
09. 02. 2016 BUILDING STATISTICS DRAFT
-
08. 29. 2016 ATTEND CPEP SEMINAR
-
08. 26. 2016 TURNED IN PROJECT INITIATION CHECKLIST 1&2
-
08. 26. 2016 MAILED AE DEPT THANK YOU LETTERS TO SPONSORS
-
07. 22. 2016 CONFIRMED MASTER LIST
-
07. 22. 2016 OBTAINED PROJECT DOCUMENTATIONS
-
07. 21. 2016 OWNER PERMISSION